PROJECT:

ETEC Systems Inc. (now Applied Materials), Hayward, CA and Hillsboro, OR
The Hayward project involved a 156,000 SF expansion of existing semiconductor mask writing tools manufacturing facility. HVAC systems were designed to provide “exquisite” temperature control (+0.1 F). The Hillsboro project was a 177,000 SF facility on a green field site with all new utilities and infrastructure. Both projects included tool hook-up and were designed and constructed simultaneously. Projects were delivered utilizing a fast track design/build approach. The approximate total value was $85 million.